Allied Telesis GS900/5E Switch User Manual


 
Chapter 2: Installation
34
9. Power ON the end-nodes connected to the switch.
10. Check that all the SPD/LINK/ACT LEDs are green. If any of the LEDs
are OFF, refer to “Troubleshooting” on page 37 for instructions.
The switch is now ready for use.