®
®®
®
USER’S GUIDE
switched rack pdu
27
Selecting a menu to perform a task
• To do the following, see Switched Rack PDU Settings:
– Configure the overload thresholds for each phase
– Configure the Overload Outlet Restriction for each phase
– Set the Name, Location, and Coldstart Delay for this device
• To do the following, see Outlet Settings:
– Apply power to and remove power from the outlets
–Set Power On Delay, Power Off Delay, and Reboot Duration for
the outlets
– Set the names and associated web links for the outlets
• To do the following, see Event-Related Menus:
– Access the event log
– Configure the actions to be taken based on the severity level of an
event
– Configure SNMP Trap Receiver settings for sending event-based
traps
– Define who will receive e-mail notifications of events
– Test e-mail settings
• To do the following, see Network Menu:
– Configure new TCP/IP settings for the PDU
– Identify the Domain Name Service (DNS) Server and test the
network connection to that server
– Define settings that affect FTP, Telnet, the Web interface, SNMP,
and e-mail
• To do the following, see System Menu:
– Control Administrator and Device Manager access
– Manage Outlet User access