INSTALLATION
14
DIP SWITCH #
BANK ADDRESS
12 34
DOWN DOWN DOWN DOWN
BANK 00 (Default)
UP DOWN DOWN DOWN BANK 01 PRIMARY/SECONDARY
DOWN UP DOWN DOWN BANK 02 SECONDARY
UP UP DOWN DOWN BANK 03 SECONDARY
DOWN DOWN UP DOWN BANK 04 SECONDARY
UP DOWN UP DOWN BANK 05 SECONDARY
DOWN UP UP DOWN BANK 06 SECONDARY
UP UP UP DOWN BANK 07 SECONDARY
DOWN DOWN DOWN UP BANK 08 SECONDARY
UP DOWN DOWN UP BANK 09 SECONDARY
DOWN UP DOWN UP BANK 10 SECONDARY
UP UP DOWN UP BANK 11 SECONDARY
DOWN DOWN UP UP BANK 12 SECONDARY
UP DOWN UP UP BANK 13 SECONDARY
DOWN UP UP UP BANK 14 SECONDARY
UP UP UP UP BANK 15 SECONDARY
Example:
Four OmniView ENTERPRISE Quad-Bus Series KVM Switches (F1DE208C) are
daisy-chained together to control 32 computers. The DIP switch on the primary units
are set to “BANK Address 00” and the secondary units are each set to a unique BANK
address between 01 and 15 (BANK 00 needs to be configured for daisy-chain operation,
as noted above).
Installation
Before you begin:
1. Make sure that all computers and switches are powered off and that each Switch
has been assigned a unique BANK address.
2. Place primary and secondary Switches in the desired locations.
DIP Switch Configuration Chart