Completing the Installation
3-8 Installation
b. Verify that the RJ21 connector associated with the twisted pair segment has the proper
pinouts and check the cable for continuity.
c. Check that the twisted pair connection meets the dB loss and cable specifications outlined
in Chapter 2.
If a link is not established, contact Cabletron Systems. Refer to Section 1.2 for details.
6. Repeat steps 1 through 5 until all connections are made.
3.6 COMPLETING THE INSTALLATION
After installing the SmartSwitch and any optional HSIM, and making the connections to the
network, the SmartSwitch is ready to be configured through Local Management. Refer to
SmartSwitch Series 6H202, 6H203, 6H252, 6H253, 6H258, 6H259, 6H262, 6E233, and 6E253
Local Management User’s Guide for information on how to access and use Local Management.
Refer to Chapter 4 for information on LEDs and troubleshooting.