Appendix A Specifications
Purcell FLX25GT Cabinet Specifications
A.4.4 ONS 15310-MA OSP configuration
The following ONS 15310-MA SDH OSP accessories were tested and is complaint with OSP and WW
EMC requirements:
15310(E)-MA-SA(=)
15310-MA-FTA(=)
15310-EIA-HD-A(=)
15310-EIA-HD-B(=)
15310E-EIA-HDA(=)
15310E-EIA-HDB(=)
15310(E)-28WBE-3BBE(=)
15310(E)-84WBE-3BBE(=)
15310-CE-MR-6(=)
15310-CTX-2500-K9(=)
15310E-CTX-K9(=)
To install ONS 15310-MA SDH in an OSP with a different cabinet and if NEBS compliance is required,
the cabinet must be GR-487 compliant. In addition, the ONS 15310-MA SDH installed in the cabinet
must be tested to NEBS requirements and following components must be installed:
DS1 primary and secondary surge protection modules.
To install ONS 15310-MA SDH in an OSP with a different cabinet, which does not require NEBS
compliance, and if FCC and or other WW EMC requirements must be covered, the following primary
surge protection modules must be installed:
DS1 ADC ComProtect DS1 protection module (ComProtect® Solid-State)
DS3 ADC ComProtect DS3 protection module (ADC P3M)
To install ONS 15310-MA SDH in an OSP with a different cabinet and safety compliance with UL
60950-1 is required, the following components must be installed:
E1/DS1 insulation transformer (rated 1500Vac rms)
Two Cylix DS1/E1 Secondary Protection Modules PCI 050-628-02.
Cylix DS3/E3 Secondary Protection Module PCI 050-631-01 and DS3 primary protection
modules.
Turn off or on AC power in Purcell FLX25GT OSP cabinet
Complete the following steps to turn off or on AC power in Purcell FLX25GT OSP cabinet:
Step 1 Turn off the main breaker in the AC load center.
Step 2 Turn off the two Valere rectifier breakers in the AC load center.
Figure A-1 shows Valere rectifier breakers in the AC load center.