Cisco Systems IE200016TCB Switch User Manual


 
2-13
Cisco IE 2000 Switch Hardware Installation Guide
OL-25818-04
Chapter 2 Switch Installation
Connecting to Power
Step 7 Configure the baud rate and character format of the PC or terminal to match the console port
characteristics:
9600 baud
8 data bits
1 stop bit
No parity
None (flow control)
Step 8 Connect power to the switch as described in Connecting to Power, page 2-13.
Step 9 When the PC or terminal displays the bootloader sequence, press Enter to display the setup prompt.
Follow the steps in the “Completing the Setup Program” section on page C-8.
Connecting to Power
Tools and Equipment
Obtain these necessary tools and equipment:
Ratcheting torque flathead screwdriver that exerts up to 15 in-lb (1.69 N-m) of pressure.
For the protective ground connector, obtain a single or pair of stud size 6 ring terminals (such as
Hollingsworth part number R3456B or equivalent).
Crimping tool (such as Thomas & Bett part number WT2000, ERG-2001, or equivalent).
10-gauge copper ground wire (such as Belden part number 9912 or equivalent).
For DC power connections, use UL- and CSA-rated, style 1007 or 1569 twisted-pair copper
appliance wiring material (AWM) wire (such as Belden part number 9318).
Wire-stripping tools for stripping 10- and 18-gauge wires.
A number-2 Phillips screwdriver.
A flat-blade screwdriver.
Supported Power Supplies
The supported power supplies are listed below.
Table 2-1 Supported Power Supplies
PWR-IE65W-PC-DC PWR-IE65W-PC-AC PWR-IE50W-AC-IEC PWR-IE50W-AC
Current DC-DC AC-DC AC-DC AC-DC
Input
18-60 VDC/4.3 Amp 110/220 VAC and
88-300 VDC
110/220 VAC
110/220VAC and
88-300 VDC
Output 54VDC/1.2 Amp 54VDC/1.2 Amp 24VDC/2.1Amp 24 VDC / 2.1Amp