Cisco Systems 2020 Switch User Manual


 
Installing a LightStream 2020 Switch 2-9
Installing Fantails
Step 7 Repeat the procedure above if the LS2020 switch contains a second DC power tray.
Step 8 Observe the green power LED on the front of the power tray when power is applied. If the
LED is not lit, check for incorrectly connected wires or problems in the DC power source.
Installing Fantails
This section explains how to mount and connect fantails in your LS2020 switch (see Figure 2-4).
Fantails provide connectors for datacables on low-speed (V.35, X.21and RS-449) lines and T3 lines
that are attached to cell line card/T3 access cards in an LS2020 switch.
If your system has no low-speed or cell line card/T3 modules, skip to the section “Attaching Data
Cables.”
Note RS-449 refers to a popular physical layer interface standard that is now called EIA/TIA-449.
However, to avoid confusion in this document, the “RS-449” nomenclature will be retained when
describing the components and capabilities of an LS2020 switch.
Required Tools and Equipment
Obtain the following equipment and tools in preparation for installing fantails:
Fantails in the desired quantity (provided by Cisco Systems).
Required fantail cables (provided by Cisco Systems).
Fantail mounting screws, clip nuts, and washers (provided by Cisco Systems).If your equipment
rack has metric-threaded rails, you must provide appropriate mounting screws.
A 5/16-inch slotted-tip screwdriver.
Adhesive labels for making appropriate notations on each fantail.
A grounding wrist strap for ESD protection during fantail installation.
Note If you are installing X.21 fantails and you plan to configure the ports as DTEs, you must
obtain and install a 15-pin male-to-male gender converter on each port in order to change the female
connector to a male connector. Note, however, that the gender converters are not required for X.21
ports configured as DCEs.