Cold-Mount® Laminator Operation Manual January 2006
Setting the Roller Gap
Figure 11
Figure 12
With the proper gap it will not be possible
to pull the board and slide it between the
rollers.
Once the gap is set feed a test board
through the laminator. If the rollers crush
the board, the roller gap is set too close.
Now that the rollers are properly aligned
you are ready to set the gap for the work
you are running.
Raise the top roller evenly as described in
the previous section and place the
substrate between the rollers.
Now lower the top roller evenly until the
roller just touches the substrate. Then
rotate each knob an additional three
quarters of a revolution. This will allow for
about 1/16” spring compression when the
material is fed thru the laminator. (Rule of
thumb is that the roller gap should be about
1/16” less than the thickness of the
substrate.)