CYRAQ™ 21 CyberResearch
®
Displays
2.3 Panel Mounting: CRxF/CRxR 21
Prior to performing subsequent steps, ensure the panel-mounting location (including
panel thickness) is suitable for the C
YRAQ 21, and meets Environmental requirements in
Specifications section.
3
NOTE: Panel thickness should not exceed: .55" (14.1mm) if the unit has the standard
3.2mm (1/8") Poron™ gasket installed. Suggested panel thickness is calculated based on
standard CYRAQ 21 parts and dimensions, custom units may not meet these
specifications. Prior to panel mounting a CYRAQ, the included gasket must be affixed to
the rear of the enclosure.
2.3.1 Panel-Mount Gasket Installation
IMPORTANT! Unless requested at the time of purchase, the display is shipped with
gasket applied. Skip to section 2.3.2.
However, in certain instances the mounting gasket may be shipped loose to allow for
increased installation flexibility in the case of custom applications. This permits
customers to then choose which mounting application best suits their environment—
panel- or rack-mount. Affixing the gasket to the back of the CYRAQ’s enclosure is
recommended for panel mounting applications; while adhering directly to the mounting
plate is recommended for rack-mount applications.
The mounting gasket is a critical component to this monitor’s NEMA 4X rating for
watertightness—it must be installed correctly to meet this standard. It is also important to
note that the rack-mount installation procedure differs from the panel mount procedure.
Please read the instructions below carefully before installing the gasket.
1. Place the monitor face down on a flat surface with bottom of the monitor closest
to you; take care not to damage or scratch the screen.
2. Arrange the gasket to match monitor orientation; align Section D with bottom of
monitor’s enclosure.
3. Remove adhesive backing of Section A on gasket.
3
NOTE: It’s important to focus on aligning the holes of gasket and studs on the rear of
the enclosure rather than their respective edges.
4. Align center hole (in Section A) of gasket
with center stud on rear of monitor; take
care not to let other portions of the gasket
touch mounting plate until aligned
properly.
5. Carefully align and place the rest of
Section A, working out from center.
6. When done, firmly press down and
smooth gasket in Section A.
A
7. Repeat process for each of the other three
sides.
Figure 5: Panel Mount Gasket Installation
B C
D
16 ©Copyright 2005 CyberResearch, Inc