Installation Drawings
50
Figure 33 Liebert NX 160-200kVA UPS to 49" battery cabinet interconnection
C
C
C
A
A
NX 160-200KVA UPS Module
Front View
49" Battery Cabinet Right-Side Views
B
B
D
D
D
NOTES:
1. All cables must be repositioned prior to and while setting the cabinets in their installed location.
2. Refer to the individual drawing of each piece of equipment for additional details.
Run From To Conductors
A UPS Battery Terminal Block External Battery Cabinet Positive, Negative
B External Battery Cabinet
Additional External
Battery Cabinet(s)
Positive, Negative
C
Battery Cabinet(s) Breaker
Control Terminal Block
UPS Monitoring Board
Battery Breaker
Auxiliary Contacts
D UPS Ground Battery Cabinets Ground Ground