Extron electronic 305SA Switch User Manual


 
Outline of Installation Steps
Stage 1 — Install the Screen and Projector
c Mark the screen location (page 12).
c Install projector to verify location (page 12).
c Verify the image location (page 15).
c Cut the ceiling tile (page 16).
c Preliminary safety hardware installation (page 16).
c Finish projector drop ceiling mount installation (page 17).
c Secure the projector drop ceiling mount to the ceiling (page 18).
c Install the electrical box (if required) (page 19).
c Install the screen (page 19).
Stage 2 — Mount the PVT Wall Plates and the MLC 104 IP Plus.
c
Install the mud rings (page 23).
c Pull cables (at the input locations) (page 24).
c Install the wall plates (page 25).
c Install the MediaLink Controller (page 26).
Stage 3 — Install the FF 120 Speakers.
c Cut the ceiling tile (page 30).
c Install the speaker on the drop ceiling (page 30).
c Terminate the speaker cable for the PVS switcher (page 32).
Stage 4 — Install the PMK 550 and the PVS 305SA IP.
c Install the PMK 550 base plate (page 34).
c Pull the cables (at the switcher location) (page 35).
c Finish installing the pole mount kit (page 36).
Stage 5 — Configure the PoleVault Switcher and the System.
c Configure the switcher — MLS Switcher Configuration program (page 37).
c Configure the system — Global Configurator (page 38).
c Test the system (page 39).
c Final installation (page 41).
The following pages contain instructions for installing the PoleVault IP System. Where possible, line drawings and
photos from an actual installation are used to clarify some of the steps discussed in the text. Most images have a