Foundry Networks M2404C Switch User Manual


 
Foundry NetIron M2404C/M2404F Metro Access Switches
January 2007 © 2007 Foundry Networks, Inc. 4
Hardware Description
Front Panel
Enhanced GigE Ports 100baseX Ports GigE Ports
Switch Management Ports (Outband Port on
top and Console Port on bottom)
PSU LEDs Reset Button
Figure 3: NetIron M2404F Platform Front Panel
Enhanced GigE Ports 10/100baseTX Ports GigE Ports
Switch Management Ports (Outband Port on
top and Console Port on bottom)
PSU LEDs Reset Button
Figure 4: NetIron M2404C Platform Front Panel
To prepare for installation, make sure you have an ESD wrist strap that can be attached to a
grounded metal surface. Put on the ESD wrist strap and ground yourself by attaching the clip
end to a grounded metal surface (such as an equipment rack) to act as ground
.
WARNING
For safety reasons, the ESD wrist strap should contain a series 1
meg ohm resistor.
To install an SFP transceiver into a port, do the following:
1. Put on the ESD wrist strap and ground yourself by attaching the clip end to a grounded
metal surface (such as an equipment rack) to act as ground.
2. Remove the new module from its protective packaging.