Foundry Networks M2404C Switch User Manual


 
Foundry NetIron M2404C/M2404F Metro Access Switches
January 2007 © 2007 Foundry Networks, Inc. 13
Installation and Setup
This section provides installation and setup instructions. The platform can be installed in a
standard 19-inch rack or as a standalone unit in a desktop configuration.
Packing List
The shipping package includes the following items:
NetIron M2404F /NetIron M2404C platform.
One AC (ACPS) or DC (DCPS) power-supply unit, installed.
One power cable.
Two rack-mounting brackets with screws
Console cable
1 Blank PSU filler
Documentation CD
WARNING
If the installation requires a power cord other than the one supplied with
the device, make sure you use a power cord displaying the mark of the
safety agency that defines the regulations for power cords in your country.
The mark is your assurance that the power cord can be used safely with
the device.
Unpacking
The platform is factory tested and inspected prior to shipment. In case of damage to the unit
during shipment, contact your local dealer.
It is recommended that you keep the shipping package until the unit has been installed and
verified as operational. The platform, like all electronic devices with static sensitive
components, should be handled with care.
Rack Mounting
The supplied mounting brackets can be attached to the sides of the chassis either flush with the
front panel (flush-mounting) or midway between the front and rear panels (mid-mounting). Use
the supplied screws to fasten the mounting brackets to the chassis in the required position (flush
or mid-mounting).
Before mounting any equipment onto the rack, make sure that there is generous clearance
behind the rack for proper ventilation and for easy access to the rear components. Do not place
objects that might obstruct airflow behind the chassis.