Fuji Bikes UG230H-LS4x Network Card User Manual


 
6
1. Operational Procedures 6-1
POD Operations
1. Operational Procedures
POD Operation
Follow the procedure below to operate the POD.
1. Installation and wiring
For details, refer to Chapter 3.
2. Connection with devices including a PLC and a temperature controller
For instructions and precautions on wiring between the POD and other devices, refer to the
separate User’s Manual <PLC Connection> (FEH380).
3. POD power-on
New POD
Other than the above
When the check screen below and then the next user screen are displayed correctly, go to
step 5.
4. Screen data creation and transfer
New POD
Refer to “Initial Screen” (page 6-2).
Other than the above
Refer to Chapter 5, “Data Transference” in User’s Manual <Operation> (FEH375).
5. Operation start
The POD becomes operable with a PLC or a computer connected to it.
* If the POD does not operate normally and shows an error message, eliminate the cause by
referring to Chapter 7.