GE 300 Power Supply User Manual


 
g
GE
OPM_SGS_ISG_M22_M30_0US_V011.doc 10/38 Installation Guide
SG Series
225 & 300 kVA
3 INSTALLATION
3.1 TRANSPORT
Transport UPS only in upright position!
The UPS is packaged on a pallet suitable for
handling with a forklift.
Pay attention to the center of gravity.
The UPS must be moved in upright position.
Do not tilt cabinets more than +/- 10° during
handling.
Move the UPS in it’s original package to the
final destination site.
Do not stack other packages on top:
This could damage the UPS.
If the UPS must be lifted by crane, use suitable
lifting straps and spreader bars.
Note of the center of gravity marked on the
package.
Forklift
Crane
Fig. 3.1-1 UPS cabinets moving
Check for sufficient floor and
elevator loading capacity.
3.1.1 Dimensions and weight
Dimensions
SG Series
225 and 300 kVA
(W x D x H)
64.96 x 31.50 x 70.90 inches
1,650 x 800 x 1,800 mm
SGS_225-300_UPS dimensions_GE_01US
H
W
D
Fig. 3.1.1-1 UPS cabinet dimensions
Weight
SG Series
225 and 300 kVA
UPS rating
Weight
lbs / kg
Floor loading
lbs/sq.ft - kg/m
2
SG Series 225 kVA 2,756 / 1,250 194 / 947
SG Series 300 kVA 3,087 / 1,400 218 / 1,061
P.S.: Weights including the 5th harmonic filter.