GE HC HP Network Router User Manual


 
3-2 MDS Intrepid-HC HP Installation and Operation
Site Acceptance Procedure
The purpose of the following procedures is to verify that all installation requirements were noted and checked.
Following this procedure will ensure proper, long-lasting, and safe operation of the product.
The checklist below summarizes the installation requirements of the site.
SITE ACCEPTANCE CHECKLIST
1. SITE INFORMATION
Customer:
Radio model:
Site name:
Site code:
Radio link code:
Site address:
2. ANTENNA MOUNTING
Antenna mount type:
Mount is of sufficient height to clear local obstructions OK
Mount is safely positioned to not cause a safety hazard OK
Mount is secure and perpendicular OK
Mount is grounded as per site specifications OK
All steelwork is Galvanized or Stainless Steel as appropriate OK
3. ANTENNA
Antenna type (model and size):
Antenna is securely fixed to mount OK
Antenna is grounded as per site specifications OK
Antenna sway braces are installed correctly (where
applicable)
OK
Antenna Radome is securely fitted (where applicable) OK
Water drain plugs are fitted and removed, as appropriate OK
Antenna sealing O-Ring is properly fitted and not damaged OK
Antenna/Launch unit polarization is as per link requirements OK