GE HC HP Network Router User Manual


 
MDS Intrepid-HC HP Installation and Operation
3-3
SITE ACCEPTANCE CHECKLIST
(continued)
4. OUT-DOOR UNIT
Type of RFU mount: (Direct or Remote mount)
RFU is securely mounted to the antenna or pole OK
RFU is grounded as per installation instructions OK
RFU‘s polarization is as per link requirements OK
RFU is installed properly and has no physical damage OK
For Remote-Mount Only:
Remote mount kit is securely mounted to the pole OK
Flexible waveguide has no physical damage and connectors
are sealed
OK
All flexible waveguide bolts are secured using washers and
lock-washers, as appropriate
OK
Flexible waveguide is secured to the pole OK
6. COAX CABLE
Overall cable length:
Cable type:
N-Type connectors assembled properly on the cable OK
Cable connected securely to RFU and IDU OK
Cable connector is weather-proofed (sealed) at the RFU OK
At the RFU, cable has a service/drip loop to prevent
moisture from entering the connector
OK
Cable is secured using suitable restraints to fixed points at
regular intervals (0.5 m recommended)
OK
Cable has no sharp bends, kinks, or crushed areas. All
bends are per manufacturer specifications
OK
Grounding/lightning protection is as per site specifications OK
Lightning protection type and model:
Cable point-of-entry to building/shelter is weather-proof OK
Cable ends are properly labeled OK