Hitachi MP-96RD625-01 Computer Drive User Manual


 
3-50 Chapter 3 Preparing for Universal Replicator z/OS Operations
Hitachi Universal Replicator for IBM /OS User’s Guide
No. If the Status of
the Pair in the
Primary Site is
and the Status of
the Pair in the URz
Secondary Site is
Please Perform the Following Operation before Transferring
Business Tasks Back to the Primary Site
1 Pending Duplex Hold
Make sure that the status of the pair in the primary site is
Suspend, and then perform the operation explained in the row
No. 3 of this table.
2 Duplex Hold Perform the operation explained in the row No. 1 of this table.
3 Suspend Hold Step 1: Release the URz pair from the primary site.
Step 2: Make sure that all the pairs belonging to the journal group in
the primary site are released.
Step 3: Create a URz delta resync pair that extends from the primary
site to the URz secondary site. For information about requirements for
creating the pair, see section 3.8.5.3.
4 Hold Hold
The pair is in normal condition. You can transfer business tasks
as described earlier in this section.
5 Hlde Hold
Change the status of the Hlde pair back to Hold. For
information about how to do this, see section
Restoring a Pair of
Data Volumes.
6 Simplex Hold
Step 1: Release the pair in Hold status from the URz secondary
site.
Step 2: Create a URz delta resync pair that extends from the primary
site to the URz secondary site. For information about requirements for
creating the pair, see section 3.8.5.3.