Installation and Configuration
18
5.5 External Battery Cabinet Installation
Optional Liebert external battery cabinets may be connected to the UPS to provide additional battery
run time. External battery cabinets are designed to be placed on one side of the UPS or stacked
beneath the UPS.
1. Visually inspect the external battery cabinet for freight damage. Report damage to the carrier
and your local dealer or Liebert representative.
2. For slide rail installations, first remove the top/side fin. Top/side fin slides forward and then lift
up to remove. Optional rack-mount handles are shipped with the external battery cabinet and
may be installed at this time if desired.
3. Securing hardware and slide rails are sold separately. Please contact your local dealer or Liebert
representative for these additional options and any assistance needed. Fasten the slides into
position with the screws per the instructions included with the slide rails.
4. Use the enclosed support bases for the tower option to prevent tip-over. One additional set of
support base extensions ships with each external battery cabinet.
5. Connect the supplied external battery cabinet cable to the rear of the external battery cabinet,
then to the rear of the UPS.
6. The UPS is now equipped with additional backup battery run time. For approximate battery run
times, refer to Table 5.
!
CAUTION
The external battery cabinet(s) are heavy (see 13.0 - Specifications). External battery
cabinets can be used in rack-mount or tower configuration. Take proper precautions when
lifting them.
!
CAUTION
Do not turn on (close) the battery cabinet circuit breaker yet. Complete the installation first.
NOTE
You must use the included configuration program to program the UPS for the number
of external battery cabinets connected. Instructions for the configuration program are in
7.0 - Configuration Program.
OUTPUT
BREAKER
20A 240V~/T
OUTPUT
BREAKER
20A 240V~/T
ON
ON
INPPUT
OUTPUT ONLY CB DOES NOT
CONNECT BYPASS POWER TO
MANUAL BYPASS SWITCH.
BREAKER 30A
ON
OFF
OFF
OFF
UPS
UTILITY
COMMUNICATION PORT
SEE MANUAL
FOR CONNECTIONS
OFF
REPO
RELAY CARD USB/WEB CARD
MAITANENCE BYPASS
AVAILABLE
UPS
AVAILABLE
ATTACH JUMPER
HERE FOR SHIPPING
AND EXTENDED
STORAGE
EXT. BATTERY
240V 25A
ON
OUTPUT BREAKER
30A/250V~T
-
INTERNAL BATTERY
CONNECTOR INSTALL
BEFORE OPERATING
+
3U
2U
2U
Spacers added to support
base to accommodate
additional battery cabinets