10/100 Managed 24-Port GigaSwitch
To power on the GigaSwitch, simply connect the AC power cord to the back
of the GigaSwitch, then plug the power cord into an electrical outlet. The
GigaSwitch will boot up within approximately 30 seconds.
If you need to reset the GigaSwitch, depress the RESET button (located on
the rear of the switch) for approximately one or two seconds.
Port 24 on the EtherFast II 10/100 Managed 24-Port GigaSwitch can act as an
uplink port, allowing you to uplink to other switches or hubs using a standard
Ethernet connection.
To uplink the switch, connect one end of a Category 5 (or better) network
cable into Port 24, then connect the other end of the cable into the desired
network device’s uplink port. To enable uplinking capability, depress the
MDI/MDIX button on the front of the switch.
Use the following instructions to install the Gigabit Expansion Modules:
Before you begin power off the GigaSwitch by disconnecting all cables from
the GigaSwitch.
1. Place the GigaSwitch right side up, with the rear panel facing you.
2. Use a screwdriver to remove the desired Expansion Module cover plate
(labeled “Slot 1” and “Slot 2”). Set the screws aside for step 4.
3. Insert the Gigabit Expansion Module (must be purchased seperately) into
the selected Gigabit Expansion Port, ensuring that it is seated firmly in
place.
4. Secure the module in place using the screws and a screwdriver.
The Gigabit Expansion Module installation is complete.
You can now re-connect the cables to the back of the GigaSwitch.
7
Linksys EtherFast
®
II Series
The 10/100 Managed 24-Port GigaSwitch can be used as a free-standing unit,
or installed in any standard 19-inch rack.
Use the following instructions to rack-mount the GigaSwitch:
Before you begin, disconnect all cables from the GigaSwitch.
1. Place the GigaSwitch right side up, with the front panel facing you.
2. Position a mounting bracket over the screw holes on one side of the
GigaSwitch.
3. Secure the mounting bracket by inserting three screws into the screw
holes. Use a screwdriver to tighten the screws, ensuring that they are
fastened firmly in place.
4. Repeat steps 2 and 3 to install the other mounting bracket on the opposite
side of the GigaSwitch.
5. Insert the GigaSwitch into the 19-inch rack and secure it with suitable
screws (not provided). Ensure that the ventilation holes are not obstructed.
The rack-mount installation is complete.
You can now re-connect the cables to the back of the GigaSwitch.
6
Rack-Mounting the GigaSwitch Powering On and Resetting the GigaSwitch
Uplinking the GigaSwitch
Installing the Gigabit Expansion Modules