Powerware 9390 Power Supply User Manual


 
Using the Control Panel
9-24
Powerware
®
9390 UPS (40–80 kVA) Installation and Operation Manual S 164201535 Rev C
Select COM PORT SETUP from the System Setup Level 1 menu to display the COM Port
Setup screen. This screen allows selection of the serial COM port to set up. Figure 9-29
shows the COM Port Setup screen.
Use the
or pushbuttons to highlight the the COM port to be set up, then press the
SELECT pushbutton. To return to the System Setup screen, press the
pushbutton.
COM PORT SETUP
COM 1
COM 3
COM 2
SELECT
Figure 9-29. COM Port Setup Screen