Powerware Powerware 9355 Switch User Manual


 
TIE CABINET INSTALLATION
EATON Powerware
®
9355 Tie Cabinet (20/30 kVA)Installation Guide S 164201630 Rev A www.powerware.com
14
21. Hardwire the load to the Tie Cabinet (see Figure 8).
Neutral
Line 1
Ground
Line 2
Line 3
Maintenance Bypass
Wiring to UPS TB4
Figure 8. Load Connections