Sun Microsystems 96257 Computer Drive User Manual


 
Sun Confidential: Internal Only
Planning Worksheet 1 of 5
> [electronic form] <
Account __________________________ Completed By ____________________ Date ___________
Site Readiness Planning Factors Information to Note / Comments
1A. Installation teams defined? 1A.
1B. Installation schedule created? 1B.
1C. HVAC requirements compliance verified? 1C.
1D. Power requirements compliance verified? 1D.
1E. Flooring requirements compliance verified? 1E.
1F. Future expansion considered? 1F.
1G. Floor plans completed? 1G.
1H. Cable routing established? 1H.
1I. Delivery team identified? 1I.
1J. Doorway clearances verified for transit of VTSS
cabinet(s) between dock and installation area?
1J.
1K. Delivery dock receiving time scheduled? 1K.
1L. Pallet jack / forklift availability verified? 1L.
1M. Incline compliance of ramp(s) verified? 1M.
1N. Elevator capacity verified? 1N.
1O. Pre-staging area readiness verified? 1O.
1P. Site and data center access arranged? 1P.
Additional Information to Note / Comments (Specify By Above Item Number):