Telenetics 2185 Network Router User Manual


 
2-1
Chapter 2
Installation
INTRODUCTION
This chapter contains the information you need to install you Telenetics
2185.
CUSTOMER RESPONSIBILITIES
After delivery of your equipment and before installation, you are
responsible for moving it to the installation site, unpacking and check-
ing it for material shortages and/or damage, which may have occurred
during shipment.
SITE SELECTION AND PREPARATION
Ensure that the area where your Telenetics 2185 is to be installed is
clean and free from extremes of temperature, humidity, shock, and
vibration.The site must meet the physical, environmental and power
requirements listed in Table 1-2 - 2185 Specifications.
Install the 2185 within 5 feet (1.5 meters) of a grounded ac outlet capa-
ble of furnishing the required primary power (115 V ac or 230 V ac).The
unit must also be located within 50 feet (15.2 meters) of the terminal
ports and/or modems to be connected to it.At least 5 inches (12.7 cm)
clearance at the rear of the unit is needed for interface cabling.