4.1.3 Power Connection Cable Routing and Conduit Placement
The following illustrates the proper cable routing that should be followed during the power
connection process of the 15/25/30/33 kVA.
Note:
1) Input and Output conductors shall be installed in separate conduits, and installed in
accordance with the latest edition of NEC and the Local Authority having jurisdiction.
2) Battery conductors shall be installed in a separate conduit and be of low resistance type.