Tyco 0-1591099-x Switch User Manual


 
24 Port Stackable Managed Switch – User Guide Page 8
Installation
Pre-Installation Requirements
Before starting the hardware installation, make sure the installation environment has the
below items:
PC with 10/100Mbps RJ-45 Network Interface Card to connect the Switch’s copper
port.
UTP/STP cable with RJ45 connectors. Ensure that the cable has been tested
AC Power: 100 to 240V AC at 50/60 Hz: Make sure that the power is accessible
and the AC power can be connected easily.
Dedicated power supply: Use a dedicated AC supply to power the Switch.
A dry cool place: Keep the Switch away from moisture. Avoid direct sunlight,
sources of heat, and a high amount of electromagnetic interference.
Mounting tools: If you intend to mount the Switch in a rack, make sure you have all
the tools, mounting brackets, screws etc
Caution:
Cabling must be away from sources of electrical noise such as radio, computers, transmitters,
broadband amplifiers, power lines etc.
Mounting the Switch
The 24 Port Stackable Managed Switch is suitable for use in an office environment where it
can be rack-mounted in standard EIA 19-inch racks or Desktop.
Desktop Mounting
Set the Switch on a sufficiently large flat space with a power outlet nearby, and near the
center of all networked devices. Make sure mounting surface on the bottom of the Switch is
grease and dust free. Remove adhesive backing from the Rubber Feet.
Figure 5. Attach Rubber Feet to each corner on the bottom of the Switch
Apply the Rubber Feet to each corner, on the bottom, of the Switch. These footpads can
prevent the Switch from shock/vibrations.
Caution: Do not place objects on top of the Switch
Product Number 0-1591099-x © Tyco Electronics 2005 Issue 1