A SERVICE OF

logo

HCD-E1 Installation & Operation Manual Appendix D - IR-ETH/Q Interface Module
Installation and Operation D-3
D.4 Installation and Operation
Figure D-3 shows the IR-ETH/Q rear panel. Figure D-4 shows the DIP switch,
which is located on the reverse side of the board.
Figure D-3 IR-ETH/Q Module Layout
Figure D-4 DIP Switch Location