Adaptec Storage Manager Network Card User Manual


 
Chapter 12: Managing Tasks 124
Scheduling a Task
If a task is lengthy and limits access to components on your storage
space, you may want to set a date and time for the task to complete,
instead of running the task while there is activity on your storage space.
If a task must be performed regularly, you can schedule it to recur at
preset times.
You can schedule these Adaptec Storage Manager tasks:
Expanding a logical drive
Changing a logical drive’s RAID level
Modifying the stripe size of a logical drive
Verifying a logical drive
Verifying and fixing a logical drive
To schedule one of these tasks:
1 Complete each step of the task until you are prompted to click
Apply. (Don’t click Apply.)
Schedule button