Alcatel Carrier Internetworking Solutions 046-3MS Switch User Manual


 
5.2. Chec king for smooth ope ra ti on
»
Disconnect the equipment from mains power supply to
ensure that it cannot be switched on unintentionally.
In order to check for smooth operation compressed air
supply to the SKW must be maintained.
Danger! Limbs may be caught in machinery!
Unscrew the plug at the solenoid valve.
Remove the hose from the hopper loader
outlet port.
Move the manual actuator of the solenoid
valve from position B to position A and
back
Observe the piston through the pipe
socket at the “hopper loader outlet port”.
The piston must move back and forth
quickly.
Put the hose at the hopper loader outlet
port back in place.
Screw the plug to the solenoid valve.
6. Tech ni cal data
046-3MS
SKW
Tech ni cal data 36