American Power Conversion 208/220 Power Supply User Manual


 
Mechanical assembly – Floor Anchoring
990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 21
Floor anchoring of stand-alone systems
In seismic areas, it is recommended that the installation be bolted to the floor, and that the batteries be
secured in the Enclosure by the Battery Securing Brackets.
For floor anchoring, use the 2 transport brackets that were used to secure the UPS to the pallet
during transport.
Align the 4 holes in the bottom angle of the Floor Anchoring Bracket on either side of the
Enlosures to the pre-drilled holes in the floor
Front Panel
Note
Recommended minimum number of floor bolts per Enclosure: 4 (1 in each corner).
Recommended floor bolt size: 5/16(3/8) in/8 mm.
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Model:
Serial:
BATTERY UNIT
Floor Anchoring
Bracket
(re-use of transport
bracket)