American Power Conversion 208/220 Power Supply User Manual


 
Electrical Installation – Connection of APC Humidity Sensor
990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 39
Guide the cable up alongside the side panel and insert the Humidity Sensor plug into the socket
marked “Probe”.
Fasten the cable to the side panel with enclosed cable ties.
Remount the cable-inlet plate.
Place the Humidity Sensor where applicable.