American Power Conversion 60kW InfraStruXureTM System Power Supply User Manual


 
6 InfraStruXure System—Installation and Start-Up
Space Considerations
Study the figure below to determine your space requirements for installing the InfraStruXure PDU.
Consult your local codes and the NEC for additional requirements.
123>12in(304mm)
Ceiling Clearance
Minimum Rear Clearance
208V:36in(914mm)
480V:42in(1067mm)
Minimum Front Clearance
208V:36in(914mm)
480V:42in(1067mm)