36 InfraStruXure System—Installation and Start-Up
Configure the InfraStruXure Manager
Once all equipment is installed, the network cables are connected to the InfraStruXure Manager hub
(or switch), and start-up of the system is complete, configure the InfraStruXure Manager.
See als
o
For instructions, see the InfraStruXure Manager Installation and Quick-Start
manual included with your InfraStruXure Manager.
Note
If you use PowerChute Network Shutdown (PCNS) software with your
InfraStruXure UPS, your UPS must have a connection to the “User LAN” (public
network) for PCNS to function correctly. If the Network Management Card
installed in your UPS is connected to the InfraStruXure Manager’s “APC LAN,”
you must install a second Network Management Card in your UPS and connect it
to the “User LAN” (public network) to use PCNS.