American Power Conversion 60kW InfraStruXureTM System Power Supply User Manual


 
InfraStruXure System—Installation and Start-Up 33
Start-Up Procedure
Safety warnings
This section provides instructions on how to perform a system start-up. Do not skip any steps in this
procedure.
Ensure that all power is off
Electrical
Hazar
d
Only APC Field Service Engineers or qualified, APC-trained personnel may
perform a system start-up.
Electrical
Hazar
d
Before you proceed, ensure that power is off by following the procedure in this
section.
1. Set the PDU Main Input to OFF.
2. Set the upstream input circuit breaker (utility or
UPS) to the OFF or Locked Out position.