American Power Conversion 60kW InfraStruXureTM System Power Supply User Manual


 
Index
InfraStruXure System—Installation and Start-Up 43
A
automatic transfer switch,
installing
, 25
C
cable ladders, installing, 24
circuit breaker size, determining by
input voltage
, 2
E
electrical requirements, 9
Emergency Power Off (EPO)
connect the switch
, 1820
overview
, 10
troubleshooting problems
with
, 19
warnings
, 3, 20
EMI warnings
, 3
Environmental Management
System
installing
, 25
Environmental Monitoring Unit,
installing
, 25
EPO. See Emergency Power Off
(EPO).
I
InfraStruXure Manager
configure the
, 36
installing
, 25
route data cables to
, 31
InfraStruXure PDU
connect the power source
to
, 1417
dimensions
, 5
electrical requirements
, 9
heat output
, 8
level the
, 13
maximum weight
, 7
space consideration
, 6
input conductors, connecting
, 17
installation
, 1331
basic procedure
, 1112
connect the Emergency Power
Off switch
, 1820
connect the power source to the
PDU
, 1417
connect user input contacts and
relay outputs to the user
connection plate
, 2122
install InfraStruXure rack-
mount devices
, 25
install shielding troughs,
shielding partitions, and cable
ladders
, 2324
level the PDU and NetShelter
Enclosures
, 13
route and attach overhead
wiring
, 2628
route data cables to the
InfraStruXure Manager
, 31
wiring under the floor
, 2930
M
main input switch, 3334, 39
main output circuit breaker
, 35, 39
maintenance
warnings while the PDU is
receiving power
, 2
N
NetShelter VX Enclosure
dimensions
, 5
level the
, 13
maximum weight
, 7
O
operation, 37
how to apply power to the
system
, 3738
total power off, ensuring
, 39
P
PDU monitoring unit, connecting
contacts to
, 22
PDU. See InfraStruXure PDU.
R
rack PDUs, installing, 25
rack-mount devices, installing
, 25
relay outputs, connecting to the user
connection plate
, 21
S
safety, 13
symbols used in this manual
, 1
warnings
, 23
Emergency Power Off
(EPO)
, 3
EMI
, 3
for maintenance while the
PDU is receiving power
, 2
installation/maintenance
, 2
receiving/moving
, 2
total power off
, 3
shielding partitions
dimensions
, 5
installing
, 23
shielding trough
dimensions
, 5
shielding troughs
installing
, 23
site planning
, 512
basic installation
procedure
, 1112
dimensions
, 5
electrical requirements
, 9
Emergency Power Off
(EPO)
, 10
heat output
, 8
space considerations
, 6
weight considerations
, 7
start-up procedure
, 3336
apply power to the system
, 34
35
configure the InfraStruXure
Manager
, 36
ensure total power off
, 33