American Power Conversion MX28B-400 Power Supply User Manual


 
MX28B-400 +24V Product Manual
22 990-9218
5.8 Battery Temperature Probe Installation
The optional temperature probe is used to monitor the battery string temperature. To get the
most representative temperature measurement, the probe should be placed in contact with a
battery cell that is centrally located. The probe should be placed directly in contact with the cell
(not the frame surrounding the cell). Generally, the cell cover can be used; be careful not to
allow the probe body to touch the terminals.
1) Plug the connector end of the temperature probe into J5 the control unit backplane card.
2) Route the cable as required to position the probe on the selected battery cell
3) Remove the adhesive protection strip from the probe body and press the adhesive side of
the probe on the battery cell cover.
5.9 Power-Up and Checkout
Before initiating power-up and checkout, ensure that the following conditions exist:
1) Make sure that the external circuit breaker protecting the cables from the battery to
the power plant is turned OFF (the battery cables should be connected to the power
plant, but the battery should not be connected).
2) Make sure that all load circuit breakers are turned OFF (including the one feeding the
GMT fuses if the unit has the GMT fuse option).
3) Verify that all rectifiers have been installed.
5.9.1 Apply AC Power
Turn on the circuit breakers that supply ac power to the rectifiers in the MX28B dc power plant.
The main screen should appear on the control unit display (see Figure 5.9-1). The display on the
control unit is a 2-lines by 16-characters display. The cursor cycles below the characters of the
active selection on the display. Information shown in the second line of Figure 5.9-1 that
extends beyond 16 characters (to the right of the “S” in “ALARMS”) can viewed on the control
unit display by using the scrolling controls (refer to Section 6 for operation of the control unit).
NOTE: When ac power is initially applied, there is a 60-second period during which no alarms
are reported.
MX28B +
STATUS ALARMS SYSTEM MODULES BATT PIN OEM
Figure 5.9-1
5.9.2 System Parameters Verification/Adjustment
The MX28B system control unit is delivered with pre-programmed parameter default settings.
A complete listing and description of all system configuration parameters as well as displayable
system status and information is provided in Section 6. Read Section 6 to gain an understanding
of and how to use the operational features provided by the MX28B dc power plant. As a
minimum, the following parameters should be verified and adjusted, if required, before
connecting batteries or loads to the power plant: