Cisco Systems 3120 Network Hardware User Manual


 
Contents
iv
Cisco AVS 3120 Application Velocity System Hardware Installation Guide
OL-11805-01
General Precautions 2-4
Maintaining Safety with Electricity 2-4
Protecting Against Electrostatic Discharge 2-5
Preparing Your Site for Installation 2-6
Environmental Requirements 2-7
Choosing a Site for Installation 2-7
Ensuring Overcurrent Protection 2-7
Grounding the AVS 3120 2-7
Creating a Safe Environment 2-8
AC Power Requirements 2-8
Power Supply Guidelines 2-8
Cabling 2-8
Precautions for Rack-Mounting 2-9
Precautions for Products with Modems, Telecommunications, or Local Area Network Options 2-10
Required Tools and Equipment 2-10
CHAPTER
3 Installing the AVS 3120 3-1
Unpacking and Inspecting the AVS 3120 3-2
If the Product is Damaged 3-2
Installing Your AVS 3120 3-2
Attaching a Two-Post Rack Bracket to the AVS 3120 3-3
Installing the AVS 3120 on a Workbench or Tabletop 3-5
Connecting Cables 3-6
Connecting AC Power 3-7
Booting the AVS 3120 3-8
Booting with a Console Connected 3-8
Establishing a Serial Console Connection 3-9
Configuring Network Settings 3-10
Setting the Time 3-12
Checking the Front Panel LEDs 3-13
Removing or Replacing an AVS 3120 3-14
CHAPTER
4 Troubleshooting the AVS 3120 Hardware 4-1
Checking the Basics 4-1
Checking Connections 4-2