Cisco Systems 3120 Network Hardware User Manual


 
Index
IN-3
Cisco AVS 3120 Application Velocity System Hardware Installation Guide
OL-11805-01
network, setting up 2-10
precautions for rack-mounting 2-9
preparing for
LAN options, precautions for
2-10
modems, precautions for 2-10
telecommunications, precautions for 2-10
required tools and equipment 2-10
site preparation 2-6
site requirements 2-6
tabletop 3-5
tools and equipment required 2-10
two-post rack bracket instructions 3-3
unpacking and inspecting 3-2
workbench 3-5
L
LAN
options, precautions for
2-10
precautions 2-10
LED indicators
compact flash
3-13
monitoring AVS 3120 operating status 3-13
power 3-13
status 3-13
line conditioners, using 5-5
M
modem
precautions
2-10
N
network, physically removing an AVS 3120 3-14
network configuration 3-10
P
port connectors 1-3
power
AC power receptacle
1-3
connecting to system 3-7
power indicator LED 3-13
power source interruptions, preventing damage 5-4
power protection devices 5-5
power source interruptions 5-4
power supplies, using uninterruptible 5-5
power supply guidelines 2-8
R
rack mounting
precautions
2-9
two-post rack bracket 3-3
radio frequency interference. See RFI
rear panel
connections
1-3
features 1-3
removing an AVS 3120 from a network 3-14
RFI, preventing effects of 5-3
RJ-45 cable pinouts 1-5
RJ-45 to DB2-5 cable pinouts 1-7
RJ-45 to DB-9 cable pinouts 1-7
S
safety
creating a safe environment
2-8
electrostatic discharge 2-5
general precautions 2-4
important safety instructions 2-2
installation 2-1
precautions with electricity 2-4
preventing EMI 2-6
safe environment, creating 2-8