3-6 AlphaServer GS80/160/320 User's Guide
3.3 Power Cabinet
One power cabinet is required for all systems. The power cabinet
houses the control panel, AC input boxes, power supplies, PCI I/O
boxes, and storage.
Figure 3–3 Power Cabinet Configuration (32-P System)
PK0615A
System
Box 4
(Brown)
System
Box 3
(Orange)
System
Box 2
(Green)
System
Box 1
(Blue)
Subrack 1
(Blue)
Subrack 2
(Green)
Subrack 3
(Orange)
Subrack 4
(Brown)
Blue
Green
Orange
Brown
AC Input
2
AC Input
1