Removal and Replacement Procedures
Maintenance and Service Guide 5–29
13. Release the ZIF connector
1
to which the LED board cable is
attached and disconnect the LED board cable
2
from the
system board (Figure 5-24).
14. Remove the four PM2.0 × 5.0 screws that secure the system
board to the base enclosure. The screws are located in the
following locations:
❏
Next to the pen holder spring clip
3
❏
Directly behind the USB connectors
4
❏
Directly behind the external monitor connector
5
❏
Left side of the heat sink grille
6
Figure 5-24. Removing the System Board Screws