Datalogic Scanning DS2400 Barcode Reader User Manual


 
DATALOGIC DS2400
Installation
- 2.5
2.3.2 Junction Box Electrical Connections
The connection and wiring procedure for Junction Box is described as
follows:
1) Open the junction box by unscrewing the 4 cover screws.
2) Pass all System cables through the glands in the junction box housing.
3) To connect the power and input/output signals:
Prepare the individual wires of the system cables by stripping the
insulation back approximately 11 mm.
Using a device such as a screwdriver, push down on the orange lever
directly above the clamp (see Figure 2.6).
Insert the wire into the clamp and release the lever.
The wire will now be held in the spring clamp.
Figure 2.6 - System cable connections to the junction box
The wiring used can be solid or stranded but must meet the following
specifications:
Positions 1-4: 24 - 16 AWG 0,2 - 1,5 mm
2
Positions 5-39: 26 - 20 AWG 0,14 - 0,5 mm
2
The junction box pinouts are indicated in the following table: