D-Link 2000 Server User Manual


 
212D-Link ShareCenter DNS-320L User Manual
Section 4 - Conguration
Finished: Click on the Finish button if you are satised with all
the settings of the Backup job created. Otherwise click
on the Previous button to go back and make changes.
Alternatively click on Exit to end the conguration
without adding a Remote Backup job.
Remote
Backups list:
Task: The name of the Remote Backup job.
Schedule: When the Remote Backup job will execute.
Status: Current status which can be
• Ready: the remote backup job is ready to be
executed.
• Finished: the remote backup job has executed
completely and successfully.
• Failed: the Remote backup job was unsuccessful
during execution.
Enable/Disable: If the button shows a red circle the
remote backup job is enabled. Clicking the red button
will disable the remote backup job and the button will
change to a green right pointing triangle. Clicking the
green triangle will enable the job again.
Backup now: Clicking this button will execute the
backup job immediately as long as the job is enabled.
Recovery: Clicking this button will write the backup
les and folders back into the source le system from
the backup target system (reverse the le direction).
Navigation buttons: Use these buttons to move up
and down in the list when there are multiple jobs
congured.
Refresh Button: Click this button during a backup or
recovery process to monitor the progress by updating
the progress completed bar.