Note: For information about the specific revisions of the server operating
system and the storage-system FLARE and Access Logix software that are
required for your revision of the host agent, see the release notes for the host
agent on the EMC Powerlink website. To access this website, see Finding current
information,
page 8 .
Power-Cycling the storage system
Note: Do not issue verify_disk_array while the SP is powering up. You must
wait until the SP has completed the powerup cycle.
Solaris does not generally support the powering down of a storage
device while the Solaris server is running. There are, however,
occasions when we recommend power-cycling a storage system as part
of service. When power-cycling a storage system, it is important to
observe the following guidelines:
If the system is booted from the storage system, the server must be
shut down before the storage system is powered down.
If the system does not boot from the storage system, it is still
important to unmount any file systems on the storage system before
power-cycling the storage system.
EMC recommends that you stop all I/O, including raw I/O, before
power-cycling the storage system. However, the system will not
panic if raw I/O occurs when the storage system is powered down.
If there is any attempt at I/O while the storage system is off or
while it is going through its boot sequence, the failover software
will attempt to fail over.
EMC CLARiiON Server Support Products for Solaris Server Installation Guide
21