Enterasys Networks 7KR4297-02 Switch User Manual


 
Completing the Installation
3-16 Installation
Completing the Installation
CompletingtheDFEDiamondmoduleinstallationdependsonifthemoduleisbeinginstalledin:
•anewDFEDiamondmodulesystem(refertoCompletingtheInstallationofaNewSystem
onpage 317),or
•anestablished,operatingDFEDiamondmodulesystem(refertoCompletingInstallationof
DFEDiamondModulein
anExistingSystemonpage 318).
VT Series Port Adapter Wiring and Signal Diagram
RJ45 DB25
Pin Conductor Pin Signal
4 Red 2 Transmit (TX)
1 Blue 3 Receive (RX)
6 Yellow 5 Clear to Send (CTS)
5 Green 7 Ground (GRD)
2 Orange 20 Data Terminal Ready
Modem Port Adapter Wiring and Signal Diagram
RJ45 DB25
Pin Conductor Pin Signal
1 Blue 2 Transmit (TX)
2 Orange 8 Data Carrier Detect (DCD)
4 Red 3 Receive
5 Green 7 Ground (GRD)
6 Yellow 20 Data Terminal Ready (DTR)
8 Gray 22 Ring Indicator
RJ45 Connector (Female)
Pins
81
DB25 Connector (Female)
Pins
25 14
13 1
RJ45 Connector (Female)
Pins
81
DB25 Connector (Male)
Pins
14 25
113