122 Operating Manual BX900 S1
Hot-plug components
© cognitas. Gesellschft für Technik-Dokumentation mbH 2010 Pfad: C:\Programme\FCT\tim_app\tim_local\work\WALTER\OBJ_DOKU-4953-006.fm
Figure 44: Installing a connection blade
Ê Open the release lever (1) of the connection blade and push it carefully into
the empty slot.
Figure 45: Locking the connection blade
Ê Push the connection blade into the slot as far as it will go.
Ê Push the release lever in the direction of the arrow until it clicks into place.
1