Weight [kg (lb)] (*2) 150 (330)
Air conditioning
requirements
Maximum heat output [kJ/h (BTU/h)] 14,400 (13,649)
Exhaust air
flow [m
3
/min
(ft
3
/min)] (*3)
FAN at low speed (Low) 14 (494)
FAN at normal speed (Normal) 21 (742)
FAN at high speed (High) 24 (848)
Temperature
and humidity
requirements
(*4)
Operating Temperature [°C (°F)] (*5)
Humidity [%RH] 20 to 80
Maximum wet-bulb
temperature [°C (°F)]
29 (84.2)
Non-operating (*6) Temperature [°C (°F)] 0 to 50 (32 to 122)
Humidity [%RH] 8 to 80
Maximum wet-bulb
temperature [°C (°F)]
29 (84.2)
Noise [dB] (*7) (*8) 61
Acoustic power level [B] (*8) 7.8
Allowable
vibration [m/
s
2
(gal)]
Operating (including standby state) 4.0 (400) (synthetic seismic
waves)
Non-operating (*9) 10.0 (1000) (synthetic
seismic waves)
Allowable dust concentration [mg/m
3
] 0.15
Power
requirements
Input voltage and number of phases 200 to 240 VAC ±10%
Single phase
Frequency and fluctuation range 50/60 Hz +2/-4%
Maximum
power
consumption/
apparent
power
Operating Input voltage: 200 V 4.00 kW / 4.21 kVA
Standby Input voltage: 200 V 95 W / 126 VA
Power factor (*10) 0.95 or more
Rush current [A] (Inrush time) (*11) 20 or less
Leakage current [mA] (*12) 3.5 or less
*1 The dimensions do not include protrusions.
*2 The values are for the device with all options installed.
However, the values do not include the weight of mounted rack-mount rails (7 kg) and cables.
You can use the following formula to calculate the weight of the device based on its configuration:
Equipment weight = 86 + (11 x A) + (8 x B) + (2 x C)
PRIMEQUEST 1000 Series Hardware Installation Manual
CHAPTER 1 Installation Information
8 C122-H004-07EN