FIGURE 2.17 100 to 120 V configuration (primary power feed, no redundant power supply)
*1 The power cable (AC#0) is connected to the PSU (PSU#0) on a one-to-one basis.
*2 This change to the power supply configuration requires a 100 V power supply for the PCI_Box, and the power
supply must be prepared separately.
*3 Use the power cable supplied with the 100 V power supply for the PCI_Box instead of the standard power cable
supplied with the device.
100 to 120 V redundant power supply configuration (primary power feed, redundant power
supply)
FIGURE 2.18 100 to 120 V redundant power supply configuration (primary power feed, redundant power
supply)
*1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis.
*2 This change to the power supply configuration requires a redundant power supply (100 V) for the PCI_Box, and
the power supply must be prepared separately.
*3 Use the power cable supplied with the redundant power supply (100 V) for the PCI_Box instead of the standard
power cable supplied with the device.
PRIMEQUEST 1000 Series Hardware Installation Manual
CHAPTER 2 Connection Information
37 C122-H004-07EN