Fujitsu C122-E119EN Server User Manual


 
A.1 Rack Mounting
The PRIMEQUEST 1000 series (including peripheral devices) has been developed and its operation guaranteed
with the basic assumption that it is mounted in a Fujitsu 19-inch rack. The requirements in A.1.1 Arrangements for
installation work must be satisfied for safe use of a unit mounted in a Fujitsu 19-inch rack.
When mounting the PRIMEQUEST products in a rack manufactured by another company, customers need to
confirm on their own responsibility that the rack meets the PRIMEQUEST product specifications and requirements.
See A.2.2 Requirements for mounting in a rack manufactured by another company.
For details on the models 2742/2737/2724/2642/2624/2616, contact the distributor where you purchased your
product, or your sales representative.
A.1.1 Arrangements for installation work
Arrange the installation work by using the following steps.
Remarks
For the models 2742/2737/2724/2642/2624/2616, contact the distributor where you purchased your product, or
your sales representative.
TABLE A.1 Arrangements for installation work
(1)
Consider
earthquake-
resistant
anchoring for rack
installation.
(2)
Select a rack.
(3)
Select a fixed
construction.
(4)
Arrange for an
optional
earthquake-
resistance kit.
Remarks
If the rack is fixed
in place
Select a rack that
comes without a
stabilizer.
Fixed
construction
using an
earthquake-
resistance kit
Earthquake-
resistance kit
(*1)(*2)
*1 The engineer responsible
arranges for the bolts and other
parts that secure the rack to the
building.
*2 There are earthquake-
resistance kits for the base racks
and expansion racks.
For base rack: Front part x 1, rear
part x 1, side part x 2, and 1 set of
rack fixing bolts
For expansion rack: Front part x 1,
rear part x 1, and 1 set of rack
fixing bolts
Note
If an earthquake-resistance kit for
a base rack is used for an
expansion rack, there will be
leftover parts. These are the parts
PRIMEQUEST 1000 Series Hardware Installation Manual
APPENDIX A Racks
48 C122-H004-07EN