Fujitsu C122-E119EN Server User Manual


 
FIGURE 2.16 200 to 240 V dual power feed configuration
*1 Power cables (AC#0 to AC#1) are connected to PSUs (PSU#0 to PSU#1) on a one-to-one basis.
*2 This change to the power supply configuration requires a redundant power supply (200 V) for the PCI_Box, and
the power supply must be prepared separately.
*3 The power distribution box must be prepared separately.
*4 To use a power distribution box, it must meet the breaker characteristics for the customer's distribution panel.
(See 2.6 Shutoff Characteristic of the Customer's Distribution Panel (Only When Connected to the Power
Distribution Box).)
100 to 120 V configuration (primary power feed, no redundant power supply)
PRIMEQUEST 1000 Series Hardware Installation Manual
CHAPTER 2 Connection Information
36 C122-H004-07EN