CHAPTER 3 Notes on Carrying In and Installing the Product
3.1 Elevator Load Conditions
34
C122-H007-01EN
Notes on Carrying In and CHAPTER 3
Installing the Product
This chapter provides notes on carrying in and installing the PRIMEQUEST 2000 series server.
3.1 Elevator Load Conditions
The rack with the device mounted is wider than the average computer. Therefore, to use an elevator to carry
in the rack, the rack may need the side boards or doors removed before loading on the elevator. When using
an elevator to carry in the rack, see the elevator load conditions in “TABLE 3.1 Elevator load conditions” and
confirm that you are properly loading the rack on the elevator.
TABLE 3.1 Elevator load conditions
Elevator
code
Load
capacity
[kg]
Width
(*1)
Depth
(*1)
Height
(*1)
Width
(*2)
Height
(*2)
Rack
Models
2742/2737/2724/
2642/2624/2616
Models
1740/1640/1624
P-6-C0
450
1400
850
2300
800
2100
Cannot be loaded
P-9-C0
600
1400
1100
2300
800
2100
Cannot be loaded
P-11-C0
750
1400
1350
2300
800
2100
Can be loaded
P-13-C0
900
1600
1350
2300
900
2100
Can be loaded
P-15-C0 1000
1600
1800
1500
1300
2300
900
1000
2100 Can be loaded
P-17-C0 1150
1800
2000
1500
1350
2300
1000
1100
2100 Can be loaded
P-20-C0 1350
1800
2000
1700
1500
2300
1000
1100
2100 Can be loaded
P-24-C0 1600
2000
2150
1750
1600
2300 1100 2100 Can be loaded
*1 Interior dimensions of the cab [mm]
*2 Door opening dimensions [mm]
3.2 Earthquake Preparedness Measures
The purpose of the earthquake preparedness measures is to prevent the computer from falling and breaking,
and to ensure operator safety as well as quick system recovery. To prevent damage to the computer system
from an earthquake, Fujitsu provides an earthquake countermeasure called "fixed construction." (A fixed
construction prevents the device from falling by fixing it in place.)
The necessity of a fixed construction is determined from the following factors:
- Magnitude of floor vibrations at the installation site
- Whether the floor is a raised floor
- Device structure
Before choosing an earthquake countermeasure and performing the actual work for earthquake